Dammam University Infra-structure Work - Hospital - Second Phase

The purpose of of this Project is; Excavation and filling, storm water system, underground piping and valves, manholes and catch basin work, sidewalks, drinking, RAW & fire water networks, fire fighting system, sanitary sewer system, irrigation system, CCTV CCM & BMS system, telecommunication system, earth work, concreting, architectural work, thermal & moisture protection, conveying systems, pumps, Cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network, drainage system network. 

Client

:

Ministry of Higher Education

Location

:

Dammam, KSA

Contract Date

:

02-12-2006

Completion Date

:

21-10-2009