Al-Riyadh Ground Water Drainage System

Collection of rising ground water throug (VCP) perforated pipes with diameters ranging from 300 mm to 500 mm and transfer to them towards; King Fahad Quarter : 10,580 m Al Taween : 1800 m Al Uraijah District : 6060 m The purpose of this project is to lower the shallow water table under the streets in above mentioned districts. The work includes trench excavation and pipe laying and all sorts of manhole constructions plus all the other items belonging to above mentioned system.

Client

:

Ar-Riyadh Development Authority

Location

:

Riyadh KSA

Contract Date

:

09-12-1992

Completion Date

:

06-05-1994